Construction Story   -    Lai Thai Villa 2012 - 2013
 

September 2013 finished


Villa 3

Villa 3 Pool

Pool Villa 3

Entrance Villa 3

Living

Living

Living - Dining

Kitchen

Master Bedroom

Guestroom

Master Bathroom

Guest Bathroom / Toilet

Living Dining

Bedroom 2

Bathroom 2

Safe

August 2013


Corridor

Living - Dining

Master Bedroom

Master Bedroon East

Furniture Master BR

Drawers

Villa 3

Villa 2

July 2013


Villa 3 with grass

Sprinklerpump

Grass from Bangkok

planting the grass

Staffhouse in construction

Staffhouse  with coloumns

June 2013


Foortiles

Roof Terasse

House Nr. 3

tiles on Terasse

first tiles in living room

the paver is an artist!

Wood-Roof Terrasse

Produktion of Hotwater-Suncolletor

May 2013


10 cm roof isolation in progress

Wood ready for eaves

cables are pulled in

Poolwall Deco (
Waterfall will follow)

Street prepaired for concrete

Street concrete

The Family is planting

Heliconia and Ixora

road to house 3 prepairing for concrete

Masterbathroom

April 2013


First row of tiles

Fine-Cement

House 3 kitchen

House 3 Livingroom

March 2013


House 3

House 2 backside

Pool House 2

House 1 and street

February 2013


House 3 roof covered

Houses 3, 2 und 1

House 3 Roof tiles ready

Houses 1 + 2

January 2013


House 3 Beams finished

House 3 Start of Roof

House 1 Coloums

Houses 2 and 3

December 2012


supporting panels

heavy loads

hard work

flatten the concret

Delivery of Concrete

Poolbuttom is done first

Arming  for Goundwalls

Arming Pool and Groundwalls

November 2012


House 3 view from Watertower

Houses and  "Seaview" from Watertower

House 1 Footings

House 1 Pool


Haus 3 Pool ready for concret


Haus 3 ready for groundbeams

September / October 2012



prepairing for first coloumn ceremony


first Coloumn celebration for good luck

Putting the concrete

ready for construction

Iron Arming for Conret Coloumns

Armings and Watertubing (backside)

Footings prepaired for House 3

Watertower with tanks (12'000 L)

June / August 2012


Watertower

Construction wood of own trees

Iron for Coloumns fende

Footings for fence


Land flatened


Land cleanded